New Prospecting and Appraisal Well Commissioned at Ety-Purovskoe Field

On October 1 on perforation of the first object was performed at prospecting and appraisal well No. 239 at Ety-Purovskoe field of TPDN Muravlenkovskneft.

The well is drilled in the new block of northern part of the field and operates in a gushing mode with the production rate of about 250 tons of oil a day.

It is necessary to note that in total 19 operational and 7 prospecting wells are drilled at the northern dome of Ety-Purovskoe field. Well No. 239 is the only well in this area which has discovered oil reserves which considerably exceed the previous ones.

At present hydrodynamical shelf researches are carried out at the well, characteristics, volumes of reserves are determined. After all, the results of this work will allow to increase the stocks of the Company by 300 thousand tons of oil.

Forecasts of geologists prove to be true again. Moreover, even greater inflow of oil is expected from the following object, which will also allow to increase the stocks of the Company by 1 million ton.